Ashford, Kent

£10.3m – 93 one and two bed apartments starting in 2020 and completing in 2021

Key Points;

  • Phase 3 remediation of existing land condition
  • Bespoke helical piling system to remove risk from contaminated land areas
  • Full design & build LGS apartment system
  • Factory in a can utilised on site and local labour employed
  • Fast track build programme of 16 weeks per block
  • Control of work operations adjacent to Network rail
  • Low impact CO2 site with “design to site” New Ways bespoke system